MAZAR-E-SHARIF, AFGHANISTAN
A.N.A ENGINEERING
BRANCH SCHOOL
03 / 2011
03 / 2014
It is consisting of design and construction of ANA
Engineering Branch School for 1000 personnel, which
includes the following buildings and facilities:
1 HQ building, 4 Class room, 4 Trainee Enlisted Barrack,
4 BOQ Barracks, 2 Command and Senior Faculty, 4
Education intr. Offices, 1 Library, 1 Fitness Center, 1
Small Arms & Ammunition, 1 PX and Finance Office, 1
Vehicle maintenance building, 1 Office Admin Facility, 2
General purpose storage, 4 Workshops, 1 Trainee Office
Operation Building, 2 POL storage, 1 Vehicle Refueling
Point and Fuel Storage, 1 Review point and Parade
Ground, 1 Flag pole, 1 Central Trash point and 14
various small trash points, 8 laundry rooms, 1 wash rack,
3 parking area, 1Water tank and Pump House, 1 DFAC
includes wooden storage and propane storage, 1
Medical Clinic, including all sewer, water, and electrical
system.
1,090
DAYS
$28M
us ARMY CORPS
OF ENGINEERS
PROJECT TIMELINE
TOTAL BUDGET
CLIENT